The challenge
The opera house project is a part of the EU-project ECO-culture. The ECO-culture project is about demonstrating energy efficient technologies integrated into three high performing cultural ECO-buildings, the Danish Royal Theatre, the Amsterdam library and the new opera house in Oslo.
The project focuses on improving energy efficiency by designing the system in a way that minimises energy consumption for heating and cooling, ventilation and lighting.
To meet the energy efficiency requirements the hydronic system had to be fully controllable i.e. the design flows must be available at all terminals at full load and the differential pressure across the control valves must not vary too much.
The solution 
IMI Hydronic Engineering has a close relationship with the consultants and the installer. The consultants have participated in seminars and were familiar with the IMI Hydronic Engineering balancing concept and products. The consultant was confident that​
IMI Hydronic Engineering could offer a solution that will give the system the right conditions to provide comfortable indoor climate with minimum energy consumption. IMI Hydronic Engineering manual balancing valves and differential pressure controllers were installed and set to provide a fully balanced and controllable hydronic system. This will ensure a comfortable indoor climate as well as energy efficient operation.
Úvod
Typ projektu Budova opery​

IMI v akci

Forbedre komforten på dit hjemmekontor
23 března 2020
Vigtig Covid-19 opdatering
17 března 2020
TA-Slider
04 října 2019
Undgå klager og højt energiforbrug
22 července 2019
Giv dine kunders VVS installationer et 5-stjernet service eftersyn
03 dubna 2019
HyTools App: Stor opdatering
15 března 2019
Nye STAD
15 června 2018
Simply Compresso
01 dubna 2018
Zeparo Cyclone og Zeparo G-Force
09 srpna 2017
Budova opery v Oslu (ENG)