National Blood Centre Hydronic balancing technology quickly delivers effective indoor climate solution for new building.

​​​​​​​​​

The challenge
The National Blood Centre was challenge​d with reducing the amount of time spent, not only installing individual hydronic balancing valves in the waterborne system, but also commissioning the system itself for the two new buildings.
Combined with the construction of the new buildings, investment was to be made into supplying new IT systems along with ongoing equipment replacement and renewal programmes. The completion of the overall project provides the required capacity and flexibility to meet emerging developments and future technologies.
The solution 
IMI Hydronic Engineering presented TA-H.U.B.® , the latest technology for specifiers, as a solution in meeting these objectives. This customized balancing solution allows you to balance up to eight terminal units from one location, delivering unparalleled c​onvenience by enabling access to functions from outside restricted areas, shortening balancing time and ensuring easier trouble shooting and maintenance.
TA-H.U.B.® was particularly suited to the new build due to its single location, where time spent on maintenance of waterborne systems is significantly reduced as well as eliminating the need for engineers to be in restricted areas. Blank points were left on the unit to enable the site to extend for future heating and chilling if required. The prefabricated unit is supported by TA Select 3, a software package that aids the design of efficient waterborne systems by specifying the correct valves according to individual requirements.
The solution delivered by IMI Hydronic Engineering with its cutting edge technology, TA-H.U.B.®, achieved the requirements set by the National Blood Centre in reducing the installation and commissioning time of the balancing valves as well as providing a comfortable climate in the two buildings.

Facts
Project type Education & Research
Building National Blood Centre
Location Bristol, UK
Owner National Blood Centre, Bristol, UK

IMI in Action

Optimizing a chilled-water hydronic system
31 October 2019
New version of HyTools app
15 March 2019
TA-Slider
09 December 2018
The TA-STAD – Legendary quality with improved performance and convenience
15 June 2018
Air and dirt can undermine system performance
14 June 2018
The IMI Eye issue 9 has arrived
05 October 2017
Simply Compresso
05 October 2017
Annual Hydronic Balancing Sales Conference
13 February 2017
Balancing and Control Specialist Conference
13 February 2017
NEBB Recertification Program - Atlanta Training Center
13 February 2017
Air and dirt can undermine system performance
06 May 2016
National Blood Centre