China Resource Centre (CRC) ​Delivering optimum indoor climate with trouble free operation for a high profile new development.

​​​​​​​​

The challenge
China Resource Centre (CRC), the new headquarters of China Resource Company, has several different buildings with a total area of 400,000m2. The development, located in Shenzhen, is a multi use development and includes a shopping centre, a 6 star hotel, an office building and luxurious residential apartments.
Aiming for the highest standards in quality, the customer needed a partner to deliver a perfect indoor climate solution with trouble-free operation.
The solution 
In the early project phase, the IMI Hydronic Engineering team in China provided seminars for the designers and consultants involved, addressing project specific requirements. This succeeded in creating an appreciation for the importance of total hydronic balancing.
The close cooperation with designers and consultants and continuous support from design to construction phase, enabled the IMI Hydronic Engineering team in China to deliver a balancing solution using manual balancing valves, providing the optimum indoor climate. In addition to the design support, the team also provided commissioning services to ensure all the valves were set up correctly. Dedication and know-how during this final commissioning phase before the opening of the building, ensured optimal system operation from the very beginning and the system continues to perform as desired by CRC and its tenants.
 ​
Facts
Project type Multi purpose
Building China Resource Centre (CRC)
Location Shenzhen, China
Consultant Parsons Brinckerholf​
Owner China Resource Company

IMI in Action

Smart Solutions for Social Distancing
23 June 2020
50th Earth Day
22 April 2020
Simple tips to improve the comfort of your home office
23 March 2020
Important update
17 March 2020
Revolutionary new actuator feature
10 January 2020
Optimizing a chilled-water hydronic system
31 October 2019
Maintenance for energy savings
20 August 2019
Exciting project won in Luxembourg
15 July 2019
Pressurisation solutions
28 May 2019
HVAC system check-up list
03 April 2019
New version of HyTools app
15 March 2019
ISH 2019
12 February 2019
TA-Slider
09 December 2018
Winter is coming - check your customers' HVAC systems
26 September 2018
Air and dirt can undermine system performance
14 June 2018
TA-STAD
13 June 2018
The IMI Eye issue 9 has arrived
05 October 2017
Simply Compresso
05 October 2017
TA-Slider campaign
20 February 2017
Zeparo G-Force
13 February 2017
China Resource Centre (CRC)