Marina Bay Sands IMI Hydronic Engineering successfully delivers cooling system for landmark development in Singapore.

​​​​​​​​​​Credits: Photographer Timothy Hursley
 
Requirement
​The impressive Marina Bay Sands development is the leading business, leisure and entertainment destination in Asia. It features large convention and exhibition facilities, 2,560 hotel rooms and suites, a rooftop SkyPark, a shopping mall, restaurants, a casino and an outdoor event plaza. Its two theatres showcase a range of leading entertainment acts. Completing the line-up of attractions is the ArtScience Museum at Marina Bay Sands which plays host to permanent and marquee exhibitions.
The owner of this prestigious project required a partner who would be able to help realise a cooling system delivering the correct cooling power to the entire 2,561 hotel rooms from the first day, and at the same time, could work according to a very tight construction schedule without compromising system performance and operational efficiency.
Solution
Based on successful cooperation with the consultant in several previous projects, TA Hydronic’s experts got involved early on in the design phase. Throughout countless technical discussions, continuous support and multiple calculations using our​ own software, TA Select, a solution was developed consisting of approximately 3,400 system components, all helping to achieve a well balanced, fully optimised cooling system.
The owner of the development was convinced that this total solution would not only deliver the comfort and operational efficiency that was required, but also give peace of mind to those in charge of the day to day operation. In 2010 the building was opened and the hydronic system is working exactly as intended.

Facts
Project type Hotels
Building Marina Bay Sands
Location Singapore
Owner Marina Bay Sands Pte Ltd

IMI in Action

Smart Solutions for Social Distancing
23 June 2020
50th Earth Day
22 April 2020
Simple tips to improve the comfort of your home office
23 March 2020
Important update
17 March 2020
Revolutionary new actuator feature
10 January 2020
Optimizing a chilled-water hydronic system
31 October 2019
Maintenance for energy savings
20 August 2019
Exciting project won in Luxembourg
15 July 2019
Pressurisation solutions
28 May 2019
HVAC system check-up list
03 April 2019
New version of HyTools app
15 March 2019
ISH 2019
12 February 2019
TA-Slider
09 December 2018
Winter is coming - check your customers' HVAC systems
26 September 2018
Air and dirt can undermine system performance
14 June 2018
TA-STAD
13 June 2018
The IMI Eye issue 9 has arrived
05 October 2017
Simply Compresso
05 October 2017
TA-Slider campaign
20 February 2017
Zeparo G-Force
13 February 2017
Marina Bay Sands