Millenium Tower II Balanced hydronic system provides energy savings and comfortable indoor climate in new office development.

​​​​​​​​
 
The challenge
The prestigious office development Millennium Tower II is situated in the heart of the Millennium City Center in Budapest. The building provides 18,000 square metres of office spaces for various businesses.
The customer required a reliable partner for the design and balancing of the hydronic system as part of the overall heating, ventilation and air conditioning (HVAC) system. A fully controllable hydronic system would provide the desired indoor comfort whilst minimizing energy usage.
The solution
IMI Hydronic Engineering worked closely with the HVAC consultant to specify the most suitable hydronic system. As a result, TA balancing valves, differential pressure controllers and terminal valves (TBV-C) were fitted throughout the building.
The TBV-C ensures accurate hydronic control and optimum throughput over a long period of time. The differential pressure controllers keep the differential pressure constant. The solution chosen for the floor convectors in the heating system was a combination of differential pressure controllers and radiator valves. A balancing procedure was conducted to verify that the design flow is available at each terminal. This fully controllable hydronic system ensures that the HVAC system will provide the desired indoor climate, minimize energy usage and run smoothly for many years to come.

Facts
Project type Office & Commercial buildings
Building Millenium Tower II
Location Budapest, Hungary
Owner TriGranit Development Corporation
Products TBV-C

IMI in Action

Smart Solutions for Social Distancing
23 June 2020
50th Earth Day
22 April 2020
Simple tips to improve the comfort of your home office
23 March 2020
Important update
17 March 2020
Revolutionary new actuator feature
10 January 2020
Optimizing a chilled-water hydronic system
31 October 2019
Maintenance for energy savings
20 August 2019
Exciting project won in Luxembourg
15 July 2019
Pressurisation solutions
28 May 2019
HVAC system check-up list
03 April 2019
New version of HyTools app
15 March 2019
ISH 2019
12 February 2019
TA-Slider
09 December 2018
Winter is coming - check your customers' HVAC systems
26 September 2018
Air and dirt can undermine system performance
14 June 2018
TA-STAD
13 June 2018
The IMI Eye issue 9 has arrived
05 October 2017
Simply Compresso
05 October 2017
TA-Slider campaign
20 February 2017
Zeparo G-Force
13 February 2017
Millenium Tower II