Valencia Opera House IMI Hydronic Engineering was asked for a solution that would solve the building​'s diverse and demanding cooling and heating needs using sea water.

​​​​​​​​​​​​​​​​​


​​​​​​​​​​​​​​The challenge
Valencia's magnificent opera house, Palau de les Arts Reina Sofía, designed by world-renowned local architect Santiago Calatrava, has a total area of more than 40,000 square metres. Four different theatres seat between 400 and 1,700 people each and then there are backstage areas, dressing rooms, restaurants and many other rooms. These various areas have very different heating ventilation and air conditioning (HVAC) needs during the course of the day, creating great complexity for indoor climate specialists.
The solution
To improve energy efficiency, the system was designed to use sea water. IMI Hydronic Engineering was asked for a solution that would solve the building​'s diverse and demanding cooling and heating needs using this unusual fluid.

Relying on its vast experience and with the help of its Hydronic College, IMI Hydronic Engineering came up with the simplest possible variable flow system that would solve the problem of providing just the right amount of heat or cooling to each indoor space, whether theatre hall or dressing room. Even this solution required more than 500 balancing valves and devices from DN 20 to DN 300. IMI Hydronic Engineering also selected software appropriate for the job and supplied training so that the HVAC system will run smoothly for years to come.​
Facts
Project type Culture
Building Palau De Les Arts Reina Sofia Opera House
Location Valencia, Spain
Consultant ICA and Grupo TEC​​

IMI in Action

Smart Solutions for Social Distancing
23 June 2020
50th Earth Day
22 April 2020
Simple tips to improve the comfort of your home office
23 March 2020
Important update
17 March 2020
Revolutionary new actuator feature
10 January 2020
Optimizing a chilled-water hydronic system
31 October 2019
Maintenance for energy savings
20 August 2019
Exciting project won in Luxembourg
15 July 2019
Pressurisation solutions
28 May 2019
HVAC system check-up list
03 April 2019
New version of HyTools app
15 March 2019
ISH 2019
12 February 2019
TA-Slider
09 December 2018
Winter is coming - check your customers' HVAC systems
26 September 2018
Air and dirt can undermine system performance
14 June 2018
TA-STAD
13 June 2018
The IMI Eye issue 9 has arrived
05 October 2017
Simply Compresso
05 October 2017
TA-Slider campaign
20 February 2017
Zeparo G-Force
13 February 2017
Valencia Opera House