Energie AG Making the world's first passive energy office building possible.

​​​​​

The challenge
Leading international multi-utility group Energie AG is the principal electricity, heating and water supplier for the Upper Austrian district with fast growing operations in many Central and Eastern European countries. Its progressive 19-storey corporate headquarters in Linz, known as the Power Tower, was designed and constructed with future generations in mind. To underline Energie AG’s core competencies of energy efficiency and sustainability, the Power Tower is the first office building in the world to feature a passive energy concept. As such, it does not require any connection to the district heating system and is able to satisfy its climate control needs without fossil fuels.
Energy is obtained from a combination of 700 square metres of solar panels, 46 boreholes and 90 foundation holes, then converted via heat pumps into hot or cold water, depending on the desired indoor climate. Nearly all of the required energy is drawn from renewable resources, reducing CO2 emissions by 300 tons a year and halving energy consumption when compared with a similar sized building using conventional technologies.
The solution
Because of its reliance on renewable energy, the Power Tower needed a precise hydronic system to achieve the ideal indoor climate. IMI Hydronic Engineering was asked to deliver a balancing solution that would fulfil the unusual and demanding requirements.
The IMI Hydronic Engineering sales team and experts from the Engineering Support Centre in Budapest worked closely with the building’s owners, consultants and installers to design and implement the perfect hydronic system. Using a variable flow four pipe system and two differential pressure controllers (pictured below) in every room, the system was so effective it actually reduced the number of circulation pumps required, further improving energy efficiency. Together with Energie AG, IMI Hydronic Engineering is setting new standards in energy efficient and sustainable building practices.
Facts
Project type Office & Commercial buildings
Building Energie AG
Location Linz, Austria
Owner Energie AG Austria

Nyheter

Hjälp dina kunder att energieffektivisera VVS-systemen
01 oktober 2019
Ny renoveringshandbok
25 april 2019
Vanliga problem i värmesystem och hur de åtgärdas
03 april 2019
Beräkna tryckhållning med HyTools
20 mars 2019
Raditrim i ny version
11 mars 2019
ISH 2019
12 februari 2019
Hur du energieffektiviserar ditt VVS-system
07 februari 2019
Lägre energinota och bättre komfort med injustering
28 januari 2019
Ny teknisk artikel - Vad är ett hydroniskt Change oversystem
16 januari 2019
Vi ses på VA Tour 2019
15 januari 2019
Framtidssäkrade lösningar på Kongahälla center
13 november 2018
Utbildningar 2019
31 oktober 2018
Energie AG