Heathrow Terminal 5 Regulating temperature and noise at Heathrow’s new Terminal 5.

​​​​​


The challenge
Terminal 5 is the biggest free standing building in the UK and the construction work began in 2002. Energy efficiency was of prime concern for the airport operator, BAA, given the size and high profile nature of the Terminal 5 site. Water is taken from a district cooling scheme, supplied by a central chiller farm, to serve all buildings across the 260ha site at Heathrow. As a result of this set up there was the risk of intermittent pressure throughout the buildings on the site – creating an uncomfortable indoor climate and unnecessary noise.
The solution 
This posed a challenge for the two-port control valves and the balancing of the systems. IMI Hydronic Engineering’ technical expertise quickly found an alternative solution: KTM and DKH combination valves that provide greater flexibility, control and cost savings for any variable flow system. Thanks to IMI Hydronic Engineering’ technical and engineering expertise and ability to provide a robust supply of valves, the system delivers energy efficiency and an optimum indoor climate control at Terminal 5 to time and budget.

Facts
Project type Transportation
Building Heathrow Terminal 5
Location Heathrow, UK
Owner BAA

Nyheter

Hjälp dina kunder att energieffektivisera VVS-systemen
01 oktober 2019
Ny renoveringshandbok
25 april 2019
Vanliga problem i värmesystem och hur de åtgärdas
03 april 2019
Beräkna tryckhållning med HyTools
20 mars 2019
Raditrim i ny version
11 mars 2019
ISH 2019
12 februari 2019
Hur du energieffektiviserar ditt VVS-system
07 februari 2019
Lägre energinota och bättre komfort med injustering
28 januari 2019
Ny teknisk artikel - Vad är ett hydroniskt Change oversystem
16 januari 2019
Vi ses på VA Tour 2019
15 januari 2019
Framtidssäkrade lösningar på Kongahälla center
13 november 2018
Utbildningar 2019
31 oktober 2018
Heathrow Terminal 5