Requirement
Brazil’s infamous Maracanã stadium in Rio de Janeiro has undergone a complete renovation in preparation for the hosting of next summer’s 2014 World Cup finals.
The near three-year refurbishment of Brazil’s largest stadium comprised an expansion from 189,000 m² to 240,000 m², and now also boasts 328 parking spaces, 292 restrooms, 60 bar areas across five floors, is lit by 23,500 low-maintenance LED lighting fixtures and contains rain water collection and clean energy solutions.
Project leaders Consórcio Maracanã envisioned transforming the stadium into an environmental heritage for Brazil through saving natural resources such as water and electricity and thereby receiving Leadership in Energy and Environmental Design (LEED) environmental accreditation, from the Brazilian Green Building Council.
In line with the stadium’s sustainable vision, a cooling system with a capacity of 10,620 kW was required to deliver the stadium’s indoor climate and temperature requirements.
Solution
​Following previous project success, consultant, Danilo Werneck, approached IMI Hydronic Engineering to provide its expertise in hydronic balancing during the project design stage, through to completion.
IMI Hydronic Engineering used TA Select, to help determine the optimum component selection, and discuss with the client at a strategic-level, how the system would respond. The close co-operation enabled both parties to agree on solutions that would guarantee the best hydronic design possible.
IMI Hydronic Engineering provided a range of high performance valves, differential pressure controllers, terminal valves, pressure-independent temperature control valves, pressure-maintenance devices and the TA-SCOPE flow and pressure measurement and diagnostics instrument, as well as further support during commissioning of the project.
During the stadium’s official reopening in June, a comfortable indoor climate was successfully delivered, with energy savings of 4% achieved through the cooling system optimisation. The state-of-the-art stadium has since successfully received LEED environmental accreditation, meeting three American Society of Heating, Refrigeration, and Air-Conditioning Engineers (ASHRAE) standards – the most common LEED standard – for efficiency, HVAC system quality and user comfort.

Facts
Project type Sports & Leisure
Building Maracana Stadium
Location Rio de Janeiro, Brazil
Consultant Danilo Werneck
Owner Consórcio Maracanã
Products STAD, STAF, STAF-SG, STAP, DA 516, DAF 516, KTM 512, TBV-C, TA-SCOPE, Zeparo ZU, Statico and Pleno

Nyheter

Hjälp dina kunder att energieffektivisera VVS-systemen
01 oktober 2019
Ny renoveringshandbok
25 april 2019
Vanliga problem i värmesystem och hur de åtgärdas
03 april 2019
Beräkna tryckhållning med HyTools
20 mars 2019
Raditrim i ny version
11 mars 2019
ISH 2019
12 februari 2019
Hur du energieffektiviserar ditt VVS-system
07 februari 2019
Lägre energinota och bättre komfort med injustering
28 januari 2019
Ny teknisk artikel - Vad är ett hydroniskt Change oversystem
16 januari 2019
Vi ses på VA Tour 2019
15 januari 2019
Framtidssäkrade lösningar på Kongahälla center
13 november 2018
Utbildningar 2019
31 oktober 2018
Maracana Stadium