Millenium Tower II Balanced hydronic system provides energy savings and comfortable indoor climate in new office development.

​​​​​​​
The challenge
The prestigious office development Millennium Tower II is situated in the heart of the Millennium City Center in Budapest. The building provides 18,000 square metres of office spaces for various businesses.
The customer required a reliable partner for the design and balancing of the hydronic system as part of the overall heating, ventilation and air conditioning (HVAC) system. A fully controllable hydronic system would provide the desired indoor comfort whilst minimizing energy usage.
The solution
IMI Hydronic Engineering worked closely with the HVAC consultant to specify the most suitable hydronic system. As a result, TA balancing valves, differential pressure controllers and terminal valves (TBV-C) were fitted throughout the building.
The TBV-C ensures accurate hydronic control and optimum throughput over a long period of time. The differential pressure controllers keep the differential pressure constant. The solution chosen for the floor convectors in the heating system was a combination of differential pressure controllers and radiator valves. A balancing procedure was conducted to verify that the design flow is available at each terminal. This fully controllable hydronic system ensures that the HVAC system will provide the desired indoor climate, minimize energy usage and run smoothly for many years to come.

Facts
Project type Office & Commercial buildings
Building Millenium Tower II
Location Budapest, Hungary
Owner TriGranit Development Corporation
Products TBV-C

Nyheter

Hjälp dina kunder att energieffektivisera VVS-systemen
01 oktober 2019
Ny renoveringshandbok
25 april 2019
Vanliga problem i värmesystem och hur de åtgärdas
03 april 2019
Beräkna tryckhållning med HyTools
20 mars 2019
Raditrim i ny version
11 mars 2019
ISH 2019
12 februari 2019
Hur du energieffektiviserar ditt VVS-system
07 februari 2019
Lägre energinota och bättre komfort med injustering
28 januari 2019
Ny teknisk artikel - Vad är ett hydroniskt Change oversystem
16 januari 2019
Vi ses på VA Tour 2019
15 januari 2019
Framtidssäkrade lösningar på Kongahälla center
13 november 2018
Utbildningar 2019
31 oktober 2018
Millenium Tower II