National Blood Centre Hydronic balancing technology quickly delivers effective indoor climate solution for new building.

​​​​​​​

The challenge
The National Blood Centre was challenge​d with reducing the amount of time spent, not only installing individual hydronic balancing valves in the waterborne system, but also commissioning the system itself for the two new buildings.
Combined with the construction of the new buildings, investment was to be made into supplying new IT systems along with ongoing equipment replacement and renewal programmes. The completion of the overall project provides the required capacity and flexibility to meet emerging developments and future technologies.
The solution 
IMI Hydronic Engineering presented TA-H.U.B.® , the latest technology for specifiers, as a solution in meeting these objectives. This customized balancing solution allows you to balance up to eight terminal units from one location, delivering unparalleled c​onvenience by enabling access to functions from outside restricted areas, shortening balancing time and ensuring easier trouble shooting and maintenance.
TA-H.U.B.® was particularly suited to the new build due to its single location, where time spent on maintenance of waterborne systems is significantly reduced as well as eliminating the need for engineers to be in restricted areas. Blank points were left on the unit to enable the site to extend for future heating and chilling if required. The prefabricated unit is supported by TA Select 3, a software package that aids the design of efficient waterborne systems by specifying the correct valves according to individual requirements.
The solution delivered by IMI Hydronic Engineering with its cutting edge technology, TA-H.U.B.®, achieved the requirements set by the National Blood Centre in reducing the installation and commissioning time of the balancing valves as well as providing a comfortable climate in the two buildings.

Facts
Project type Education & Research
Building National Blood Centre
Location Bristol, UK
Owner National Blood Centre, Bristol, UK

Nyheter

Hjälp dina kunder att energieffektivisera VVS-systemen
01 oktober 2019
Ny renoveringshandbok
25 april 2019
Vanliga problem i värmesystem och hur de åtgärdas
03 april 2019
Beräkna tryckhållning med HyTools
20 mars 2019
Raditrim i ny version
11 mars 2019
ISH 2019
12 februari 2019
Hur du energieffektiviserar ditt VVS-system
07 februari 2019
Lägre energinota och bättre komfort med injustering
28 januari 2019
Ny teknisk artikel - Vad är ett hydroniskt Change oversystem
16 januari 2019
Vi ses på VA Tour 2019
15 januari 2019
Framtidssäkrade lösningar på Kongahälla center
13 november 2018
Utbildningar 2019
31 oktober 2018
National Blood Centre