The Centrumplan Ensuring a comfortable and sustainable climate for both shops and apartments in a new development.

​​​​​​​

The challenge
The Centrumplan in Geleen, Holland is a new mixed development by Delta Lloyd Vastgoed of 12,000 sq metres accommodating both apartments and retail units. These various areas have very different heating and cooling needs during the course of a day, creating greater complexity for the heating, ventilation and air conditioning (HVAC) system. The customer was looking for a reliable and experienced partner who would support every stage of the project including design of the hydronic system, installation, commissioning and training.
The solution
IMI Hydronic Engineering provided a solution that ensuresfull controllability of the variable hydronic system. It includes manual balancing valves and differential pressure controllers.
The latter ensure that the differential pressure is kept constant in the hydronic system thereby improving the working conditions for the control valves. IMI Hydronic Engineering also made the circuits hydraulically independent so that the system can be extended step-by-step without having to rebalance the whole system. The pre-setting of TA's STAD and STAF manual balancing valves was carried out by IMI Hydronic Engineering engineers which made the installation process quicker and easier.
A special seminar was held for personnel from Thissen Installatietechniek on advanced balancing, commissioning, diagnosis and troubleshooting of the system using the TA-CBI mesauring instrument. This HVAC system will provide a comfortable indoor climate, minimise energy use and run smoothly for many years to come.​
Facts
Project type Multi purpose
Building The Centrumplan
Location Geleen, The Netherlands
Consultant Thissen Installatietechniek, Maastricht
Products STAD and STAF, STAF-SG

Nyheter

Hjälp dina kunder att energieffektivisera VVS-systemen
01 oktober 2019
Ny renoveringshandbok
25 april 2019
Vanliga problem i värmesystem och hur de åtgärdas
03 april 2019
Beräkna tryckhållning med HyTools
20 mars 2019
Raditrim i ny version
11 mars 2019
ISH 2019
12 februari 2019
Hur du energieffektiviserar ditt VVS-system
07 februari 2019
Lägre energinota och bättre komfort med injustering
28 januari 2019
Ny teknisk artikel - Vad är ett hydroniskt Change oversystem
16 januari 2019
Vi ses på VA Tour 2019
15 januari 2019
Framtidssäkrade lösningar på Kongahälla center
13 november 2018
Utbildningar 2019
31 oktober 2018
The Centrumplan