Asia Square Tower

IMI Hydronic Engineering ensures optimal indoor climate for Singapore’s Asia square tower.

When MGPA wanted to increase HVAC efficiency systems to address stringent indoor climate and temperature requirements for the development’s Tower 1, they set out to find a partner with the know-how and capability to enable precise temperature control with optimized efficiency. As such, IMI Hydronic Engineering proved to be the partner with the perfect solution.

The Asia Square Tower is a £633 million twin-tower, mixed-use development at Marina Bay, Singapore, one of the key financial centres in the region. It comprises a 305-room five-star Westin Singapore Marina Bay Hotel on the 32nd to 46th levels, 190,000m2 of Grade A office space and 5,600m2 of retail space.

The challenge

With many mixed-use development buildings, it is essential that care is taken to balance out what can be differing indoor climate requirements between the hotel, retail and office spaces of the building while delivering excellent energy efficiency. At the same time, Singapore’s equatorial marine climate meant that the comfort of the interior environment for residents, visitors and building employees was highly important.

The solution

A meeting between IMI Hydronic Engineering and consulting engineers AECOM and Meinhardt provided the company with an in-depth understanding of the customers’ indoor climate and temperature objectives for the 43-storey Tower-1.​

Following this meeting, it was agreed that the establishment of efficient hydronic balancing of the system was essential. However, it was clear IMI Hydronic Engineering faced some interesting challenges.

One of these concerned the supply of chilled water from a District Cooling plant that led to special technical requirements for maintaining the differential temperature (ΔT), otherwise the supplier may face heavy fines from the municipality. Another was a secondary pump head of 12 metres, an almost unheard of challenge. The first step in reaching the optimal solution was to review the existing system.

IMI Hydronic Engineering began with a thorough analysis, measuring differential pressure, flow and temperature inside the chilled water system. IMI Hydronic Engineering’ proven TA Select 4 hydronic calculation software was then used for hydronic calculation and component selection for a complete system solution in order to minimise energy use and provide accurate temperature control at individual room level.

Facts

Project type
Office & Commercial buildings
Building
Asia Square Tower
Location
Singapore
Gross area
246,700 m2
Owner
MPGA
Products
STAP, DA 516, DAF 516 and STAD
Certifications Achieved
Leadership in Energy & Environmental Design Core & Shell (LEED-CS) Platinum certification by the US Green Bu​ilding Council and Green Mark Platinum Award by the Building and Construction Authority of Singapore

Études de cas connexes